GRP stepover
Fall of Cruachan – GRP Stepover
Named QTS stepover file located
Client
QTS
Location
Saudi Arabia
Sector
Rail & energy infrastructure
Solution
GRP Access Walkway
Project Overview
Project scope
The client required a walkway system capable of performing reliably throughout large-scale outdoor festivals while reducing ongoing maintenance and replacement costs.
Key project challenges included:
-
Existing walkway materials deteriorated rapidly under heavy foot traffic.
-
Extreme summer temperatures and prolonged UV exposure reduced the lifespan of previous products.
-
Sandstorms and harsh environmental conditions accelerated wear.
-
Annual replacement of walkway panels created significant operational costs.
-
A long-term, high-performance solution was required without compromising visitor safety.
Vital GRP delivered a complete turnkey solution, assigning a dedicated project manager to collaborate closely with MDL Beast's design engineers throughout the project.
Following detailed consultation and engineering reviews, our team developed a bespoke GRP walkway system specifically designed for the demanding festival environment.
The solution included:
Bespoke GRP Sandwich Panels
-
Custom manufactured 18mm GRP sandwich panels
-
High-performance isophthalic polyester resin
-
UV inhibitors to minimise colour fading
-
Heavy-duty anti-slip walking surface
-
Excellent resistance to heat, sunlight and environmental exposure
-
Expected service life exceeding 20 years under normal operating conditions
Design, Manufacture & Installation
Vital GRP managed every stage of the project including:
-
Design support
-
Engineering
-
Manufacturing
-
Quality assurance
-
Logistics
-
Installation

.jpg)
A total of 5,500 bespoke GRP access panels were designed, manufactured and installed within just three months, delivering a robust, long-lasting access solution for the festival site.