Raised GRP Walkway for Oil Tanker, Scotland
Safety on Deck
Raised GRP Walkway for Oil Tanker
Project
:
Raised GRP Walkway
Location
:
Scotland

Project Overview
Vital GRP partnered closely with our client over a 13-month
period to successfully secure a turnkey contract to design and
deliver a Raised GRP Walkway for the deck of an oil tanker.
Client Challenge
The oil tanker was in dry dock in Scotland, was being refitted with a heavily populated deck that lacked safe walking routes and adequate maintenance accessibility.
The client required a turnkey solution to protect crew safety and prevent damage to vital M&E services.

Our Solution
Over a 13-month collaboration, Vital GRP designed and delivered a Raised GRP Walkway that:
-
Provides secure walking routes in harsh maritime conditions.
-
Reduces slips, trips, and falls for crew members.
-
Protects pipes, conduits, and other M&E infrastructure from accidental damage.
Outcomes & Benefits
-
Enhanced crew safety in high-risk areas.
-
Reduced risk of M&E Service damage.
-
Compliance with international safety and accessibility standards.
-
Minimal vessel downtime and rapid project delivery.

Key Features & Compliance
Substructure and Handrail System
GRP Open Mesh Anti-slip Grating Flooring
Fully compliant with BS and EN anti-slip standards
Corrosion-resistant, low maintenance finish
Long-term, safe access solution