Raised walkway, open-mesh anti-slip grating, substructure and handrail
Oil Tanker, Scotland – Raised GRP Walkway
13-month collaboration; 3D model coordination; six-day installation; fire/non-conductive/anti-sparking system
Client
Barr & Wray
Location
Saudi Arabia
Sector
Marine & offshore
Solution
Bespoke GRP Access Walkway
Project Overview
[object Object]
Project scope
Clients Challenges
The client required a walkway system capable of performing reliably throughout large-scale outdoor festivals while reducing ongoing maintenance and replacement costs.
Key project challenges included:
-
Existing walkway materials deteriorated rapidly under heavy foot traffic.
-
Extreme summer temperatures and prolonged UV exposure reduced the lifespan of previous products.
-
Sandstorms and harsh environmental conditions accelerated wear.
-
Annual replacement of walkway panels created significant operational costs.
-
A long-term, high-performance solution was required without compromising visitor safety.